Multi-Client-Site Friedrichsort, Kiel
Kiel-Friedrichsort is not only close to nature but also an industrial centre. The former Maschinenbau Kiel (MaK) site has developed into a modern heavy-machinery location. International companies from the engine construction, rail engineering and foundry industries and other service providers and suppliers take advantage of the ideal infrastructure conditions at the site in Friedrichsort, such as access to the Kieler Förde and on-site sidings. With around 1,200 employees and an area of about 65 hectares, the industrial park is a major industrial centre and an important employer in the Kiel region.
THE CHALLENGE
The complete supply structure of the industrial park was to be assigned to a single provider. Extensive retrofitting and upgrades were needed in this context.
THE GOAL
The new operator was not only supposed to retrofit and upgrade, but also to finance the transferred supply systems.
OUR SOLUTION
As part of customised energy service contracting solutions for the customers at the industrial park, GETEC has assumed the responsibility for all functional and cost risks associated with the supply of energy and utilities as well as system and facility management since 2011. This includes the provision and demand-based delivery of steam for production and heating purposes, electricity, compressed air, drinking water, extinguishing water, cooling water and natural gas for engine test beds.
FACTS AND FIGURES
Locally: 1 hot water boiler (215 kW), 4 water heaters (230 kW), 20 dark radiators (680 kW), equivalent to a total of 1,125 kW
Natural gas supply: in 3 pressure stages with 5,700 kW of connected wattage
Water: The well operation is scheduled to be shut down shortly. We will then use the grid of the municipal works for the supply. Approx. 22,000 m³/a were delivered in the past three years.